色婷婷五月婷婷热_黄色免费不卡电影网站_久久精品欧美日韩不卡三_午夜一级A片免费_AV看片资源网站_国产日韩欧美中文另类在线观看_成人电影aaa电影_精品黑一区二区三_久草免费av在线

hotline:0086-577-61673333???? 中文

High voltage switch cabinet operating stop sending key poin

Date:2017/2/7 16:30:12      Viewed:

1, in the work of all and part of the charged plate, maintenance equipment and operation should be separated with clear sign, this and the operation of the meter box is very close.
2, a secondary winding of current transformer and voltage transformer should be permanent and reliable grounding protection.
3, working in the operation of current transformer secondary circuit, the current loop are forbidden to disconnect
4, voltage transformer secondary circuit in operation work strictly prevent short circuit or check the power-off protection and secondary loop staff, without the permission of the personnel on duty are not allowed to make any brake operation.
> > > > operation in high voltage switch cabinet in sending procedures should pay attention to the following nine o 'clock
Try 1, wear protective equipment, using high pressure electric appliance city high voltage is normal.
2, open the earthing knife lock.Remove the ban closing them.
3, counterclockwise, opening grounding knife.
4, check the grounding instructions in the off position.
5, lock the grounding knife lock.
6, open the switch lock.
7, counterclockwise operation will switch is closed, then reverse clockwise energy storage operation.
8, check the status of three indicator in on.
9, lock the switch lock.
> > > > high voltage switch cabinet power operation should pay attention to the following at seven o 'clock
1, disconnect the low-voltage distribution cabinet into the line of cabinet total load switch.
2, check the status of three indicator in on.
3, press the power switch with the hand, hear switch action so far.
4, with the high voltage electric equipment respectively to the L1, L2, L3, indicator light should be with a white flicker-free.
5, unlock grounding knife.
6, clockwise operation, close the grounding knife.
7, check grounding instructions in ground state.Hang up the ban on closing them.

Prev:Protection circuit continuity design requirements
Next:Introduction to the operation and maintenance in high-voltage switchgear
Add:No. 310 Wei 17th Road, Yueqing Economic Development Zone, Yueqing City, Wenzhou City, Zhejiang Province, China hotline: 0086-577-61673333  
? Zhejiang COTTOH Electric Co.,Ltd. All rights reserved.
主站蜘蛛池模板: 可以直接看的毛片网站| 国产精品第一免费| 亚洲av无码有码在线免费观看| 日本国产精品视频| 日本黄色视频免费在线| 免费观看毛片的网站| 国产成人高清精品免费| 欧美性爱在线视频一区二区| 在线a人片免费观看视频| 成人AV久香成片免费的| 日本AAA级性生活电影| 国产青青草毛片在线| 日本美女黄色一级片| 日韩三级成年网免费观看| 簧片在线综合外国毛A片| 午夜成人圆房高清无码视频| 久久久精品视频情侣啊啊啊| 国产在线看永久AV片免费| 免费精品无码视频| 人人黄色网在线国产区精品| 国产制服丝袜在线播放 | 日韩黄色偷拍视频| 亚洲A级毛片av日韩无码插| 亚洲五月丁香影院| 成人男女毛片在线免费播放| 黄色片大黄片性熟女视频| 黃色一级A片一級片| 最新的91网址操一操影院| 亚洲有码在线观看| 蜜乳视频高清无码在线| 小黄片免费看三级片视频有码| 国产综合一区AV| 欧美日韩电影在线视频看看| 视频日韩有码亚洲日韩在线干| 国产无码高潮乱伦黄总视频| 黄色aaaaaa| 欧美一级黄色电影| 中文字幕久久第一页| 久久要要av日韩a久久| 韩日黄色A片深爱激情站| 亚洲香蕉成人AV网站在线观看|